Thanks to you, we are celebrating our 25th anniversary.pg-168.live Founding Festival
pg-168.live
Delivery time:
Delivery is scheduled for 04/20.
Payment methods are limited to credit cards and cash on delivery. For other payment methods,please check here .
*Delivery of products may take some time in cases where the order is placed on Saturdays, Sundays, or public holidays, or depending on stock availability.
| Finish | UV painting |
| Material | MDF board and Iron |
| Assemble required | 120 mins |
| Package cartons | 1 pc |
| Product load-bearing | 80 pounds |
| Packing details | 5-ply brown carton with 6 sides foam protect inside.Our product has passed the dropping test according international standard. |
| Country of original | China |
| Assemble required | Yes. And there are all parts, hardware&screw bag and paper instructions in the package. |
| Tips | Using an electric drill for installation can be more labor-saving, but it is important to position the board in advance and drive the screws accurately. |
| Category: | Servers, Sideboards & Buffets |
| Is This Item Customized: | No |
| Lithium Battery Contained: | No |
| Assembled Length: | 31.77(in) |
| Assembled Width: | 15.75(in) |
| Assembled Height: | 29.53(in) |
| Assembled Weight: | 51.92(lb) |
| Package Weight: | 56.08(lb) |
| Package Length: | 36.12(in) |
| Package Width: | 19.08(in) |
| Package Height: | 6.1(in) |
| Attached Files: | See File From Here. |
| Main Color: | White |
| Main Material: | MDF |
Search for products in the same category
Recommended level 8points
Currently, 58 reviews have been posted.